Electrodeposition Coating Division

Electrodeposition painting line production process

  • 01

    Receiving inspection

  • 02

    LOADING

  • 03

    Hot water cleaning (dip),50-60℃

  • 04

    Pre-degreasing (spray) 50-60℃

  • 05

    Degreasing #1 (dip), 50-60℃

  • 06

    Degreasing #2 (dip), 50-60℃

  • 07

    Water cleaning #1 (spray)

  • 08

    Water cleaning #2 (dip)

  • 09

    Surface Conditioning(dip)

  • 10

    Phosphasing (dip) 40-45℃

  • 11

    Water cleaning #3 (spray)

  • 12

    Water cleaning #4 (dip)

  • 13

    D.I water cleaning #1 (dip)

  • 14

    Dehydration

  • 15

    Electrodeposition coating (dip) 30℃±1

  • 16

    Ultrafiltration#1 (spray)

  • 17

    Ultrafiltration#2 (dip)

  • 18

    Ultrafiltration#3 (dip)

  • 19

    D.I water cleaning #2 (spray)

  • 20

    Setting zone

  • 21

    Drying (LNG) 200℃±10

  • 22

    Unloading

  • 23

    Shipment inspection

  • 24

    Packaging / shipping