全着图章事业部

全着涂装生产线生产工程

  • 01进口检验

    Receiving inspection

  • 02LOADING

    LOADING

  • 03汤世 (DIP),50-60℃

    Hot water cleaning (dip),50-60℃

  • 04备用脱脂 (SPRAY) 50-60℃

    Pre-degreasing (spray) 50-60℃

  • 05脱脂#1 (DIP), 50-60℃

    Degreasing #1 (dip), 50-60℃

  • 06脱脂#2 (DIP), 50-60℃

    Degreasing #2 (dip), 50-60℃

  • 07水势#1 (SPRAY)

    Water cleaning #1 (spray)

  • 08v#2 (DIP)

    Water cleaning #2 (dip)

  • 09表面调整 (DIP)

    Surface Conditioning(dip)

  • 10火星皮膜 (DIP) 40-45℃

    Phosphasing (dip) 40-45℃

  • 11水势#3 (SPRAY)

    Water cleaning #3 (spray)

  • 12水势#4 (DIP)

    Water cleaning #4 (dip)

  • 13纯税세#1 (DIP)

    D.I water cleaning #1 (dip)

  • 14守节

    Dehydration

  • 15全着图章 (DIP) 30℃±1

    Electrodeposition coating (dip) 30℃±1

  • 16UF#1 (SPRY)

    Ultrafiltration#1 (spray)

  • 17UF#2 (DIP)

    Ultrafiltration#2 (dip)

  • 18UF#3 (DIP)

    Ultrafiltration#3 (dip)

  • 19纯税세#2 (SPRAY)

    D.I water cleaning #2 (spray)

  • 20摆放区

    Setting zone

  • 21干燥炉(LNG) 200℃±10

    Drying (LNG) 200℃±10

  • 22UN-LOADING

    Unloading

  • 23出厂检验

    Shipment inspection

  • 24包装/发货

    Packaging / shipping